0 продуктов

Авторизация

NR NR/L2/TRK/053/MOD02 ISSUE 1 Inspection and Repair to Control the Risk of Derailment at Switches: Module 2: Technical Information and Inspection Requirements - Compliance Date: 4 March 2017

Список продуктов
Данный раздел/документ содержится в продуктах:

 

Network Rail

Inspection and Repair to Control the Risk of Derailment at Switches: Module 2: Technical Information and Inspection Requirements - Compliance Date: 4 March 2017
 N NR/L2/TRK/053/MOD02 ISSUE 1

 

Annotation

 

This module of NR/L2/TRK/053 covers:

a) identification of facing switch derailment hazards

b) arrangements for planning and undertaking detailed inspections of switches

c) reporting of inspections completed and defects found

d) permitted substitution and delegation of inspections.

This module does not cover:

a) frequencies for Basic Visual Inspections, Section Manager (Track) Inspections and Track Maintenance Engineer inspections (see NR/L2/TRK/001/mod02)

b) how to complete a detailed inspection (see NR/L2/TRK/053/mod03)

c) repair of defects (see NR/L2/TRK/053/mod04)

 

Автоматический перевод:

 

Проверка и ремонт для управления риском крушения в переходах: модуль 2: техническая информация и инспекционные требования - дата соответствия: 4 марта 2017

Этот модуль покрытий NR/L2/TRK/053:

a) идентификация столкновения с опасностями крушения перехода

Категории продуктов

 

 

 

Знакомьтесь, "Техэксперт"

 Техэксперт для iPad

 Для Android

АКЦИЯ!

Бесплатный доступ