VDI 4486 Reliability for intralogistics - Performance availability
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- VDI 3643 Self powered trolley system - Suspended trolley system, load 500 kg - Requirements profile for a compatible system
- 53
- VDI 3643 Self powered trolley system - Suspended trolley system, load 500 kg - Requirements profile for a compatible system
- 53.040
- DINGCD22
- VDI 3640 Self propelled transport system for workpieces
- VDI 3978 Achievement and cycle time of piece good conveyor systems
- VDI 4422 Electrical palet conveying track - Electrical conveying track
- VDI 3649 Calculation of availability in handling and storage systems
- Картотека зарубежных и международных стандартов
Verein Deutscher Ingenieure
Reliability for intralogistics - Performance availability
N VDI 4486
Annotation
This guideline offers an alternative to availability guidelines based on malfunction time (VDI 3580, VDI 3581, VDI 3649, FEM 9.222). The existing guidelines continue to be valid; selection is at the discretion of operators and manufacturers.
Performance availability may be considered if
- the business process can be defined,
- the parameters of the business process are measurable,
- buffers, redundancies and performance reserves are to be considered, and
- one party (general contractor) is responsible for the entire plant.
Performance availability cannot be used if only individual machines are analysed. This guideline refers to the unit load area in intralogistics.
Note: Application to the bulk cargo area may also be possible.