NR NR/SMS/PART/D ISSUE 8 Signal Maintenance Specifications (SMS): Level Crossing Annual Test - Compliance Date: 31 May 2017
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/L2/SIG/30014 ISSUE 11 Signalling Works Testing Handbook - Compliance Date: 7 March 2015; Contains 120 forms
- NR NR/L2/SIG/10157 ISSUE 2 Signal Sighting - Compliance Date: 26 August 2008
- NR NR/L3/SIG/11231C ISSUE 10 Signal Maintenance Testing Handbook (NR/SMTH) Combined - Compliance Date: 4 June 2016; Contains NR/SMS/SMTH/Briefing Material
- NR NR/L3/SIG/10663C ISSUE 7 Signal Maintenance Specifications (SMS) Combined - Compliance Date: 31 May 2017; Contains NR/SMS/SMTH/Briefing Material
- NR TI 000 ISSUE 33 Current Index of Technical Instructions Contained in NR/L2/SIG/11120
- NR TI 061 ISSUE 2 Actions to be Taken for Defective Stretcher Bars & Free Wheel Clearances Less than 50Mm - Contains NR/BS/Ll/067, NR/BS/Ll/112
- NR TI 047 ISSUE 1 Zero Tolerance to Earth Faults
- NR NR/L2/SIG/10660 ISSUE 8 Implementation of Signalling Maintenance Specifications - Compliance Date: 3 September 2011
- NR NR/L3/SIG/10663 ISSUE 7 Signal Maintenance Specifications (SMS) - Compliance Date: 31 May 2017; Contains NR/SMS/SMTH/Briefing Material
- Картотека зарубежных и международных стандартов
Network Rail
Signal Maintenance Specifications (SMS): Level Crossing Annual Test - Compliance Date: 31 May 2017
N NR/SMS/PART/D ISSUE 8
Annotation
GENERAL
This test plan is the ‘Service B Tests’ of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes’ by each task so that particular item of the test can be correctly recorded as per the index in ‘crossing defects’.
It does not cover AHBC installations controlled by HXP-3 crossing processors The numbering of the sections in this test plan is unique; they do not follow on from the operation sequence test in NR/SMS/Test/070 ‘Service A Tests’.
To perform the annual test the following documents will be required:
• The crossing ground plan
• The level crossing order
• The crossing control tables
• The signalling plan
Missing documentation shall be listed as a defect.
Автоматический перевод:
Signal Maintenance Specifications (SMS): железнодорожный переезд ежегодный тест - дата соответствия: 31 мая 2017
ОБЩИЙ
Этот план проведения испытаний является ‘Сервисными Тестами B’ NR/SMS/LC10 и NR/SMS/Test/070. Это для использования лица, проводящего ежегодный тест железнодорожного переезда, и имеет соответствующие ‘поля галочки’ каждой задачей так, чтобы конкретный элемент теста мог быть правильно зарегистрирован согласно индексу в ‘пересечении дефектов’.