NR NR/SMTH/PART 02 ISSUE 4 Signal Maintenance Testing Handbook (SMTH): Part 02 - Compliance Date: 31 May 2017

Список продуктов
Данный раздел/документ содержится в продуктах:

 

Network Rail

Signal Maintenance Testing Handbook (SMTH): Part 02 - Compliance Date: 31 May 2017
 N NR/SMTH/PART 02 ISSUE 4

 

Annotation

 

Maintenance Testing covers both reactive corrective work (e.g. the rectifying of faults and the replacement of faulty items on a like for like basis) and minor renewals (e.g. pre-planned work to renewal existing signalling equipment that are like for like) that are not Extensive and Simultaneous.

Purpose

The purpose of the document is to define maintenance testing requirements and processes to allow equipment to be returned to service safely.

 

Автоматический перевод:

 

Signal Maintenance Testing Handbook (SMTH): часть 02 - дата соответствия: 31 мая 2017

Тестирование обслуживания покрывает и реактивную корректирующую работу (например, исправление отказов и замену дефектных элементов на подобном для подобного основания) и незначительные возобновления (например, предварительно запланированная работа к возобновлению существующее оборудование сигнализации, которые похожи для подобного), которые не Обширны и Одновременны.

Цель

Цель документа состоит в том, чтобы определить требования тестирования обслуживания и процессы, чтобы позволить оборудованию быть возвращенным к службе безопасно.