NR NR/L2/OPS/251/1.1 ISSUE 1 Air Operations Manual: Unmanned Aircraft System (Drone / UAV) Operations - Managing the Operational Risks
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 147 ISSUE 1 'Earthing & Bonding’ of Signalling Equipment Summary
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/OPS/251 ISSUE 1 Air Operations Manual - Compliance Date: 3 December 2016
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- Картотека зарубежных и международных стандартов
Network Rail
Air Operations Manual: Unmanned Aircraft System (Drone / UAV) Operations - Managing the Operational Risks
N NR/L2/OPS/251/1.1 ISSUE 1
Annotation
This process outlines requirements on the management of risks associated with the operation of drones or UAVs near, on or over Network Rail infrastructure and mandates:
a) minimum requirements of operating organisations;
b) minimum competency requirements for unmanned aircraft operators;
c) minimum equipment requirements;
d) proximity to Network Rail Infrastructure;
e) notification arrangements;
f) accident reporting.
This process applies to any individual or organisation wishing to operate drones or UAVs near, on or over Network Rail infrastructure.
PURPOSE
This process has been introduced to describe the operating arrangements and to mitigate risk of uncontrolled operation of Unmanned Aerial Vehicles (UAVs / Drones) being operated near, on or over Network Rail infrastructure.
This standard is in alignment with the following:
Air Navigation Order (ANO) (Articles relating to unmanned aircraft operations)
Civil Aviation Authority (CAA) Guidance Publication CAP 722
European Aviation Safety Authority (EASA) or other regulatory requirements as appropriate