NR NR/L3/TEL/30088 ISSUE 4 Planned Preventative Maintenance of Radio Structures, Antennas and Feeders - Compliance Date: 4 March 2017
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 147 ISSUE 1 'Earthing & Bonding’ of Signalling Equipment Summary
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- Картотека зарубежных и международных стандартов
Network Rail
Planned Preventative Maintenance of Radio Structures, Antennas and Feeders - Compliance Date: 4 March 2017
N NR/L3/TEL/30088 ISSUE 4
Annotation
This instruction applies to all persons engaged in the maintenance of antenna systems and radiating cable systems used on Network Rail radio communications equipment.
The maintenance requirements for earthing system associated with masts is detailed in NR/L2/TEL/30074.
Purpose
This document defines the maintenance requirements for Telecoms antennas, feeder systems, radio structures, monopoles, poles, rapid deployment system frames, fall arrest systems and ancillary equipment in use on Network Rail infrastructure. This contributes to reducing the risk of equipment failure.
The purpose of maintaining and testing these systems is to:
a) decrease the incidence of failures through deterioration;
b) identify potential failures before they become service affecting; and
c) identify any problems with a fall arrest system or the integrity of a radio structure that may present a hazard to staff required to access or climb a radio structure for faulting, planned maintenance or installation purposes.
Автоматический перевод:
Запланированное профилактическое обслуживание радио-структур, антенн и едоков - дата соответствия: 4 марта 2017
Эта инструкция относится ко всем лицам, занятым обслуживанием систем антенны и излучающий кабельные системы, используемые на оборудовании для радиосвязи Network Rail.