NR NR/SIN/160 ISSUE 1 Covtec Supplementary Audible Warning Device (SAWD) - Compliance Date: 30 April 2017
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/L2/TEL/30003 ISSUE 3 Immunity Test Requirements for Lineside Communications Systems - Compliance Date: 1 September 2009
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002 ISSUE 2 Asset Data Governance Framework Manual - Compliance Date: 3 June 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002/06 ISSUE 1 Asset Data Governance Framework Manual: Data Quality Criteria Setup - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/ADG/002 ISSUE 1 Asset Data Governance Framework Manual - Compliance Date: 4 March 2017
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L2/AIF/001 ISSUE 1 Asset Data Management - Compliance Date: 04 December 2010
- NR NR/L3/AIF/002 ISSUE 1 Changing Reference Date in Asset Registers - Compliance Date: 04 December 2010
- NR NRS-SRB001 ISSUE 103 V2 Standards Briefing Report for March 2017 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L2/ELP/21087 ISSUE 7 Risk Based Maintenance for Overhead Line Electrification Assets - Compliance Date: 4 March 2017; Contains NR/L2/ELP/21087/Appendix B, NR/L2/ELP/21087/Appendix C, NR/L2/ELP/21087/Appendix F
- NR NR/CAT/STP/001 ISSUE 103 Catalogue of Network Rail Standards
- Картотека зарубежных и международных стандартов
Network Rail
Covtec Supplementary Audible Warning Device (SAWD) - Compliance Date: 30 April 2017
N NR/SIN/160 ISSUE 1
Annotation
This SIN applies to the SAWDs manufactured by Covtec Ltd which are installed at level crossings on Network Rail infrastructure.
Purpose
This Special Inspection Notice (SIN) is issued to obtain confirmation that all Supplementary Audible Warning Devices (SAWDs) installed at level crossings meet the site selection criteria set out in NR/L2/SIG/30038 and have faulting and maintenance contracts in place with the manufacturer.
Автоматический перевод:
Дополнительное слышимое предупреждение устройства (SAWD) Covtec - дата соответствия: 30 апреля 2017
Этот SIN относится к SAWDs, произведенному Covtec Ltd, которые устанавливаются в железнодорожных переездах на инфраструктуре Network Rail.
Цель
Это Специальное инспекционное уведомление (SIN) выпущено для получения подтверждения, что все Дополнительное Слышимое Предупреждение Устройств (SAWDs), установленный в железнодорожных переездах, встречает критерии выбора места, определенные в NR/L2/SIG/30038, и имеет в распоряжении обвинение и контракты на обслуживание с производителем.



