NR NR/L2/ELP/21087 ISSUE 7 Risk Based Maintenance for Overhead Line Electrification Assets - Compliance Date: 4 March 2017; Contains NR/L2/ELP/21087/Appendix B, NR/L2/ELP/21087/Appendix C, NR/L2/ELP/21087/Appendix F
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/L2/TEL/30003 ISSUE 3 Immunity Test Requirements for Lineside Communications Systems - Compliance Date: 1 September 2009
- NR NR/L3/TRK/003 ISSUE 21 Index of Track Engineering Forms - Compliance Date: 3 December 2016
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/003 ISSUE 23 Index of Track Engineering Forms - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L3/TRK/1015 ISSUE 4 Management of Basic Visual Inspection - Compliance Date: 3 June 2017
- NR NR/L2/ELP/21087 ISSUE 7 Risk Based Maintenance for Overhead Line Electrification Assets - Compliance Date: 4 March 2017; Contains NR/L2/ELP/21087/Appendix B, NR/L2/ELP/21087/Appendix C, NR/L2/ELP/21087/Appendix F
- NR NRS-SRB001 ISSUE 103 V2 Standards Briefing Report for March 2017 - Version 2 - Contains Powerpoint and Excel attachments
- Картотека зарубежных и международных стандартов
Network Rail
Risk Based Maintenance for Overhead Line Electrification Assets - Compliance Date: 4 March 2017; Contains /L2/ELP/21087/Appendix B, /L2/ELP/21087/Appendix C, /L2/ELP/21087/Appendix F
N NR/L2/ELP/21087 ISSUE 7
Annotation
This document applies to all persons responsible for planning or undertaking preventive or reactive inspection and maintenance activities on 25 kV a.c. or 1.5 kV d.c. overhead line electrification equipment.
This document describes the agreed method for Network Rail to demonstrate compliance with the ORR guidance to the common safety method on risk evaluation and assessment. Variations from the process within this document can only be granted where an alternative method of risk assessment is produced and agreed.
Purpose
This document describes the process followed in order to apply a risk based maintenance analysis to Overhead Line Equipment (OLE) by assessing the risk of equipment failure in between maintenance interventions to produce the optimum frequencies for inspections and defect removal.
The document is to be used in conjunction with any other relevant, equipment specific, Network Rail maintenance standards.
Автоматический перевод:
Рискните Основанным Обслуживанием для Верхних Активов Электрификации Линии - Дата Соблюдения: 4 марта 2017; Содержит NR/L2/ELP/21087/Appendix B, NR/L2/ELP/21087/Appendix C, NR/L2/ELP/21087/Appendix F
Этот документ относится ко всем лицам, ответственным за планирование или обязательство профилактических или реактивных инспекционных и операций по техобслуживанию на 25 кВ a.c. или 1.5 кВ d.c. служебное оборудование электрификации строки.