DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-4 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 4-Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations - Edition July 2015
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-4 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 4-Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations - Edition 2014
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 1-Procedure - Edition 2007
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- ISO 6142 AMD 1 Gas analysis — Preparation of calibration gas mixtures — Gravimetric method AMENDMENT 1: Liquid introduction - Second Edition
- BSI BS EN 14212 Ambient air - Standard method for the measurement of the concentration of sulphur dioxide by ultraviolet fluorescence - CORR: May 31, 2014
- CEN EN ISO 6142 Gas analysis - Preparation of calibration gas mixtures - Gravimetric method
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- CEN EN ISO 6142 Gas analysis - Preparation of calibration gas mixtures - Gravimetric method
- BSI BS EN 14212 Ambient air - Standard method for the measurement of the concentration of sulphur dioxide by ultraviolet fluorescence - CORR: May 31, 2014
- BSI BS EN 14212 Ambient air - Standard method for the measurement of the concentration of sulphur dioxide by ultraviolet fluorescence - CORR: May 31, 2014
- CEN EN ISO 6142 Gas analysis - Preparation of calibration gas mixtures - Gravimetric method
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- CEN EN ISO 6142 Gas analysis - Preparation of calibration gas mixtures - Gravimetric method
- CEN EN ISO 6142 Gas analysis - Preparation of calibration gas mixtures - Gravimetric method
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- CEI EN 50545-1 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- IEC 60079-29-1 INT 1 IEC 60079-29-1 Edition 1.0 2007-08 Explosive atmospheres – Part 29-1: Gas detectors – Performance requirements of detectors for flammable gases - Edition 1.0
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL NAVAL SHIP TECHNOLOGY III-1-4 III-Rules for Classification and Construction Naval Ship Technology Part 1-Surface Ships Chapter 4-Ship Operation Installations and Auxiliary Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-12-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 12-Environmental Protection Chapter 1-Guidelines for the Environmental Service System - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-6-3 I-Rules for Classification and Construction Ship Technology Part 6-Offshore Service Vessels Chapter 3-Crew Boats and Offshore Wind Farm Service Craft - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL SHIP TECHNOLOGY I-1-4 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 4-Automation - Edition 2013
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-2 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 2-Test Requirements for Electrical / Electronic Equipment and Systems - Edition 2012
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNVGL SHIP TECHNOLOGY I-1-3 I-Rules for Classification and Construction Ship Technology Part 1-Seagoing Ships Chapter 3-Electrical Installations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-4 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 4-Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations - Edition July 2015
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-1 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 1-Procedure - Edition 2007
- DNV GL ADDITIONAL RULES AND GUIDELINES VI-7-4 VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 4-Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations - Edition 2014
- Картотека зарубежных и международных стандартов
Det Norske Veritas - Germanischer Lloyd
VI-Rules for Classification and Construction Additional Rules and Guidelines Part 7-Guidelines for the Performance of Type Approvals Chapter 4-Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations - Edition July 2015
N ADDITIONAL RULES AND GUIDELINES VI-7-4
Annotation
Scope and application
These Guidelines apply to the type approval of sealing systems intended to be used in cable and piping installations for penetrations through bulkhead and decks and other fire-protection constructions in accordance with SOLAS 74, Amendment 2013, Chapter II-2, Regel 9 and IMO RESOLUTION MSC.307(88) (2010 FTP Code), Annex 1, Part 3 - Test for "A", "B" and "F" class divisions.
Furthermore these Guidelines are applicable for approval of sealing systems with regard to water and gas tightness.
Type approval certificates shall not be issued on the basis of test reports which are more than 5 years old at the date of application for type approval. If the type approval depends on several test reports with different dates, the date of the oldest report governs. However, renewal of existing type approval certificates without retesting may be carried out provided that the test report is not more than 15 years old at the date of application for renewal and that no alteration of components or construction has been made to the product
A Type Approval is not required if the pipe penetration is made of steel or equivalent material having a thickness of 3 mm or greater and a length of not less than 900 mm (preferably 450 mm on each side of the division), and no openings. Such penetrations shall be suitably insulated by extension of the insulation at the same level of the division.



