VDI 2526 Scheduling of burden materials
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- VDI 2498 BLATT 2 Procedure in material flow planning - Training example for a rough layout design
- 03
- VDI 2498 BLATT 2 Procedure in material flow planning - Training example for a rough layout design
- 03.100
- VDI 3644 Analysis and planning of factory areas - Fundamentals, application and examples
- VDI 3644 Analysis and planning of factory areas - Fundamentals, application and examples
- VDI 2498 BLATT 1 Procedure in material flow planning - Fundamentals
- VDI 3330 Costs of material flow
- VDI 4404 Delivery strategies in logistics
- Картотека зарубежных и международных стандартов
Verein Deutscher Ingenieure
Scheduling of burden materials
N VDI 2526
Annotation
Material scheduling is used to describe the shortterm planning of the supply for production with materials with regard to quantity and time while considering cost criteria. The objective of material scheduling is to guarantee the requested ability to supply while minimizing storage costs and order costs.
Автоматический перевод:
Планирование шихтовых материалов
Планирование материала используется для описания краткосрочного планирования поставки для производства с материалами относительно количества и время в то время как критерии стоимости рассмотрения. Цель существенного планирования состоит в том, чтобы гарантировать требуемую способность поставлять при уменьшении затрат на хранение и затрат заказа.