ASTM D6235 Standard Practice for Expedited Site Characterization of Vadose Zone and Ground Water Contamination at Hazardous Waste Contaminated Sites
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- API PUBL 4676 Arsenic: Chemistry, Fate, Toxicity, and Wastewater Treatment Options
- ASTM F1412 Standard Specification for Polyolefin Pipe and Fittings for Corrosive Waste Drainage Systems
- ASME COMPANION GUIDE V1 Companion Guide to the ASME Boiler and Pressure Vessel and Piping Codes - Volume 1 - Fourth Edition
- ASME B16.3 Malleable Iron Threaded Fittings Classes 150 and 300
- ASME COMPANION GUIDE V1 Companion Guide to the ASME Boiler and Pressure Vessel and Piping Codes - Volume 1 - Fourth Edition
- 23
- ASTM F1412 Standard Specification for Polyolefin Pipe and Fittings for Corrosive Waste Drainage Systems
- ASME COMPANION GUIDE V1 Companion Guide to the ASME Boiler and Pressure Vessel and Piping Codes - Volume 1 - Fourth Edition
- ASME B16.3 Malleable Iron Threaded Fittings Classes 150 and 300
- ASME COMPANION GUIDE V1 Companion Guide to the ASME Boiler and Pressure Vessel and Piping Codes - Volume 1 - Fourth Edition
- 23.040
- ASTM F1412 Standard Specification for Polyolefin Pipe and Fittings for Corrosive Waste Drainage Systems
- ASME COMPANION GUIDE V1 Companion Guide to the ASME Boiler and Pressure Vessel and Piping Codes - Volume 1 - Fourth Edition
- ASME B16.3 Malleable Iron Threaded Fittings Classes 150 and 300
- ASME COMPANION GUIDE V1 Companion Guide to the ASME Boiler and Pressure Vessel and Piping Codes - Volume 1 - Fourth Edition
- ASTM F1412 Standard Specification for Polyolefin Pipe and Fittings for Corrosive Waste Drainage Systems
- ASTM F1412 Standard Specification for Polyolefin Pipe and Fittings for Corrosive Waste Drainage Systems
- ASME B16.3 Malleable Iron Threaded Fittings Classes 150 and 300
- API RP 1615 Installation of Underground Petroleum Storage Systems - Sixth Edition
- API PUBL 1628A Natural Attenuation Processes - First Edition
- API PUBL 4761 API Groundwater Arsenic Manual Attenuation of Naturally-Occurring Arsenic at Petroleum Impacted Sites
- ASTM E2205/E2205M Standard Guide for Risk-Based Corrective Action for Protection of Ecological Resources
- ASTM E2616 Standard Guide for Remedy Selection Integrating Risk-Based Corrective Action and Non-Risk Considerations
- Картотека зарубежных и международных стандартов
ASTM International
Standard Practice for Expedited Site Characterization of Vadose Zone and Ground Water Contamination at Hazardous Waste Contaminated Sites
N D6235
Annotation
Applicability of the ECS Process—This practice covers a process for expedited site characterization (ESC) of hazardous waste contaminated sites2 to identify vadose zone, ground water and other relevant contaminant migration pathways and determine the distribution, concentration, and fate of contaminants for the purpose of providing an ESC client, regulatory authority, and stakeholders with the necessary information to choose a course of action.3 Generally, the process is applicable to larger-scale projects, such as CERCLA (Superfund) remedial investigations and RCRA facility investigations.4 When used as part of the Superfund response process, this Practice should be used in conjunction with U.S. EPA's guidance document titled Using Dynamic Field Activities for On-Site Decision Making: A Guide for Project Managers (37). The ESC process is also applicable to other contaminated sites where the ESC process can be reasonably expected to reduce the time and cost of site characterization compared to alternative approaches. The ESC process has been applied successfully at a variety of sites in different states and EPA regions. (See Table X1.1). It typically achieves significant cost and schedule savings compared to traditional site characterization. (See X1.2 and X1.3)5.
Features of the ESC Process—The ESC process operates within the framework of existing regulatory programs. It focuses on collecting only the information required to meet characterization objectives and on ensuring that characterization ceases as soon as the objectives are met. Central to the ESC process is the use of judgement-based sampling and measurement to characterize vadose zone and ground water contamination in a limited number of field mobilizations by an integrated multidisciplinary team, led by a technical leader and operating within the framework of a dynamic work plan that gives him or her the flexibility of responsibility to select the type and location of measurements needed to optimize data collection activities. Table 1 identifies other essential features of the ESC process, and Fig. 1 presents a flow diagram for the entire ESC process.