IEC TR 62278-3 Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS) – Part 3: Guide to the application of IEC 62278 for rolling stock RAM - Edition 1.0
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- CENELEC EN 61907 Communication network dependability engineering
- 21
- 33
- IEC 61907 Communication network dependability engineering - Edition 1.0
- DIN EN 62673 Methodology for communication network dependability assessment and assurance (IEC 62673:2013)
- IEC 60300-3-3 Dependability management – Part 3-3: Application guide – Life cycle costing - Edition 2.0
- Картотека зарубежных и международных стандартов
International Electrotechnical Commission
Railway applications – Specification and demonstration of reliability, availability, maintainability and safety (RAMS) – Part 3: Guide to the application of 62278 for rolling stock RAM - Edition 1.0
N TR 62278-3
Annotation
This part of IEC 62278 provides guidance on applying the RAM requirements in IEC 62278 to rolling stock and for dealing with RAM activities during the system life cycle phases from invitation to tender to demonstration in operation only. All references to IEC 62278 concern the 2002 issue.
The guide is aimed at the customers/operators and main suppliers of rolling stock. The main purpose of the guide is to:
• enable a customer/operator of rolling stock:
– to specify the RAM requirements addressing the type of operation in terms of the end customer needs, considering service availability and economic considerations;
– to evaluate different tenders, in terms of RAM requirements, on a common basis with the aid of specific RAM documents;
– to gain assurance, during design/development phase, that the rolling stock being offered is likely to satisfy the RAM contractual requirements by examining step by step detailed and specific RAM documents as an output of the RAM activities performed during the development phase;
– to validate that the rolling stock, as delivered, satisfies the specified RAM requirements;
• to enable the main supplier of rolling stock;
– to understand the customers/operators RAM requirements;
– to provide substantive information/visibility in a tender to show that the product offered is likely to satisfy the RAM requirements by performing preliminary RAM analysis;