API SPEC 11E Specification for Pumping Units - NINETEENTH EDITION; Effective Date: May 1, 2014
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- ASME NUM-1 Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
- ASME HST-4 Performance Standard for Overhead Electric Wire Rope Hoists
- ASME B30.14 Side Boom Tractors
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME STP-NU-015 A Guide to American Crane Standards for Electric Overhead Traveling Cranes, Hoists and Related Equipment for Nuclear Facilities
- ASME HST-6 Performance Standard for Air Wire Rope Hoists
- ASME B30.16 Overhead Hoists (Underhung)
- ASME HST-1 Performance Standard for Electric Chain Hoists
- ASME B29.1 Precision Power Transmission Roller Chains, Attachments, and Sprockets - Partition From ASME B29.100
- Картотека зарубежных и международных стандартов
American Petroleum Institute
Specification for Pumping Units - NINETEENTH EDITION; Effective Date: May 1, 2014
N SPEC 11E
Annotation
This specification provides the requirements and guidelines for the design and rating of beam pumping units for use in the petroleum and natural gas industry. Included are all components between the carrier bar and the speed reducer input shaft. This includes the following:
a) beam pump structures,
b) pumping unit gear reducer, and
c) pumping unit chain reducer.
Only loads imposed on the structure and/or gear reducer by the polished rod load are considered in this specification.
Also included are the requirements for the design and rating of enclosed speed reducers wherein the involute gear tooth designs include helical and herringbone gearing. The rating methods and influences identified in this specification are limited to single and multiple stage designs applied to beam pumping units in which the pitch-line velocity of any stage does not exceed 5000 ft/min and the speed of any shaft does not exceed 3600 rpm.
This standard does not cover chemical properties of materials, installation and maintenance of the equipment, beam type counterbalance units, prime movers and power transmission devices outside the gear reducer, or control systems.
See Annex A for product is supplied bearing the API Monogram and manufactured at a facility licensed by API.