IEC 62153-4-14 Metallic communication cable test methods – Part 4-14: Electromagnetic compatibility (EMC) – Coupling attenuation of cable assemblies (field conditions) absorbing clamp method - Edition 1.0
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- 13
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- 13.220
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60028 International standard of resistance for copper - Edition 2.0
- IEC 61196-1 Coaxial Communication Cables - Part 1: Generic Specification - General, Definitions, Requirements - Edition 2.0
- IEC 62153-4-5 Metallic communication cables test methods – Part 4-5: Electromagnetic compatibility (EMC) – Coupling or screening attenuation – Absorbing clamp method - Edition 1.0
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- Картотека зарубежных и международных стандартов
International Electrotechnical Commission
Metallic communication cable test methods – Part 4-14: Electromagnetic compatibility (EMC) – Coupling attenuation of cable assemblies (field conditions) absorbing clamp method - Edition 1.0
N 62153-4-14
Annotation
This part of IEC 62153 gives the in-field test method that is used to determine the coupling attenuation for installed links and channels used in analogue and digital communication systems.
This method is used to determine the attenuation of disturbing power to signal power in a cabling system, and vice versa. This determines the influence from cabling on the EMC performance of a system.
NOTE 1 The coupling attenuation of installed links and channels is dependent upon the performance of the cabling components (balance and screening if applicable), workmanship (especially termination of screens) and earthing and grounding. This procedure determines the overall effect of these parameters.
NOTE 2 This method cannot be used for verification of compliance with emission and immunity EMC standards for the complete system, including active components.
Автоматический перевод:
Металлические методы тестирования коммуникационного кабеля – Часть 4-14: Электромагнитная совместимость (EMC) – Связывающееся затухание кабельных сборок (полевые условия) поглощающий метод зажима - Выпуск 1.0



