ASME STP-NU-015 A Guide to American Crane Standards for Electric Overhead Traveling Cranes, Hoists and Related Equipment for Nuclear Facilities
Список продуктов
Данный раздел/документ содержится в продуктах:
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- ASME NUM-1 Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
- ASME HST-4 Performance Standard for Overhead Electric Wire Rope Hoists
- ASME B30.14 Side Boom Tractors
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.12 Handling Loads Suspended From Rotorcraft
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME STP-NU-015 A Guide to American Crane Standards for Electric Overhead Traveling Cranes, Hoists and Related Equipment for Nuclear Facilities
- ASME HST-6 Performance Standard for Air Wire Rope Hoists
- ASME B30.16 Overhead Hoists (Underhung)
- ASME HST-1 Performance Standard for Electric Chain Hoists
- Картотека зарубежных и международных стандартов
Ссылается на
- В списке элементов: 12
- ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications - Includes Interpretations November 2012 Through November 2013Требования гарантии качества для приложений ядерного объекта - включают ноябрь 2012 интерпретаций в течение ноября 2013
Карточка документа - ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)Правила для строительства мостовых и портальных кранов (Топ Раннинг-Бридж, многократный прогон)
Карточка документа - ASME HST-5 Performance Standard for Air Chain HoistsНорма выработки для воздушных подъемов цепи
Карточка документа - ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and SlingsСтандарт безопасности для канатных дорог, подъемных кранов, кранов, подъемов, крюков, гнезд и петель
Карточка документа - ASME B30.16 Overhead Hoists (Underhung)Верхние (подвесные) подъемы
Карточка документа - ASME HST-1 Performance Standard for Electric Chain HoistsНорма выработки для электрических цепных подъемов
Карточка документа - ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010Мостовые и портальные краны (Топ Раннинг-Бридж, отдельный или многократный прогон, главный бегущий подъем тележки) - включают интерпретации в течение января 2010
Карточка документа - ASME B30.11 Monorails and Underhung Cranes - Includes Interpretations Dated May 2004 thru August 2009Монорельсовые дороги и подвесные подъемные краны - включают интерпретации датированный май 2004 в течение августа 2009
Карточка документа - ASME NUM-1 Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)Правила для строительства подъемных кранов, монорельсовых дорог и подъемов (С мостом или тележкой или подъемом подвесного типа)
Карточка документа - ASME B30.17 Overhead and Gantry Cranes (Top Running Bridge, Single Girder, Underhung Hoist)Наверху и портальные подъемные краны (Top Running Bridge, единственный прогон, подъем Underhung)
Карточка документа - ASME HST-6 Performance Standard for Air Wire Rope HoistsСтандарт производительности для канатных подъемников воздушного проводника
Карточка документа - ASME HST-4 Performance Standard for Overhead Electric Wire Rope HoistsСтандарт производительности для служебных канатных подъемников электрического провода
Карточка документа



