IEC 62153-4-13 Metallic communication cable test methods – Part 4-13: Electromagnetic compatibility (EMC) – Coupling attenuation of links and channels (laboratory conditions) – Absorbing clamp method - Edition 1.0
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- 13
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- 13.220
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- CEN EN ISO 9239-1 Reaction to fire tests for floorings - Part 1: Determination of the burning behaviour using a radiant heat source
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI PD CEN/TR 14819-1 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 1: Funicular railways in tunnels
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI BS EN 13501-2 + A1 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services - AMD: November 30, 2009
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI PD CEN/TR 14819-2 Safety recommendations for cableway installations designed to carry persons Prevention and fight against fire Part 2: Other funicular railways and other installations
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- BSI BS EN 50119 + A1 Railway applications - Fixed installations - Electric traction overhead contact lines - AMD: May 31, 2013
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- IEC 60889 Hard-Drawn Aluminium Wire for Overhead Line Conductors - Edition 1.0
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- BSI BS IEC 60287-1-1 + A1 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses - General - AMD: November 30, 2014
- IEC 60028 International standard of resistance for copper - Edition 2.0
- IEC 61196-1 Coaxial Communication Cables - Part 1: Generic Specification - General, Definitions, Requirements - Edition 2.0
- IEC 62153-4-5 Metallic communication cables test methods – Part 4-5: Electromagnetic compatibility (EMC) – Coupling or screening attenuation – Absorbing clamp method - Edition 1.0
- BSI BS EN 45545-2 Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behaviour of materials and components
- Картотека зарубежных и международных стандартов
International Electrotechnical Commission
Metallic communication cable test methods – Part 4-13: Electromagnetic compatibility (EMC) – Coupling attenuation of links and channels (laboratory conditions) – Absorbing clamp method - Edition 1.0
N 62153-4-13
Annotation
This part of IEC 62153 details the method of laboratory test to determine the coupling attenuation for links and channels used in analogue and digital communication systems.
Автоматический перевод:
Металлические методы тестирования коммуникационного кабеля – Часть 4-13: Электромагнитная совместимость (EMC) – Связывающееся затухание ссылок и каналов (лабораторные условия) – Поглощающий метод зажима - Выпуск 1.0
Эта часть IEC 62153 подробно излагает метод лабораторного испытания для определения связывающегося затухания для ссылок и каналов, используемых в системах аналоговой и цифровой связи.
Уважаемый пользователь!
Обратитесь к обслуживающему Вас представителю за дополнительной информацией о возможности приобретения документов указанного разработчика и заказа перевода.



