NR NB 151 ISSUE 1 Pre-Planned Signal Maintenance Testing Activities
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NB 143 ISSUE 1 Level Crossing Road Traffic Lights – Synchronisation of Flashing Red Aspects
- NR NB 000 ISSUE 39 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- Картотека зарубежных и международных стандартов
Network Rail
Pre-Planned Signal Maintenance Testing Activities
N NB 151 ISSUE 1
Annotation
Planning and implementation of pre-planned SMTH activities.
Purpose
The purpose of this Notice Board is to remind staff of the pre-planning requirements for signal maintenance testing activities as defined in the Signal Maintenance Testing Handbook (SMTH) NR/L3/SIG/11231.
Автоматический перевод:
Предварительно запланированные сигнальные действия тестирования обслуживания
Планирование и реализация предварительно запланированных действий SMTH.
Цель
Цель этой Доски объявлений состоит в том, чтобы напомнить штату требований перед планированием для сигнальных действий тестирования обслуживания, как определено в Signal Maintenance Testing Handbook (SMTH) NR/L3/SIG/11231.