NR RT/CE/P/034 ISSUE 1 Reporting of Track Buckles (aka NR/SP/TRK/134)
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NB 147 ISSUE 1 'Earthing & Bonding’ of Signalling Equipment Summary
- NR NB 146 ISSUE 1 Additional Signalling Records held by NRG
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- Картотека зарубежных и международных стандартов
Network Rail
Reporting of Track Buckles (aka /SP/TRK/134)
N RT/CE/P/034 ISSUE 1
Annotation
This procedure relates to all track buckles as defined in para. 3, whether occurring in jointed or welded track.
PURPOSE
This procedure gives the requirements for the reporting of track buckles. It defines
• reportable track buckles;
• the necessary reports;
• by whom and to whom the reports must be sent, and within what timescales.
The reporting procedures described are in addition to any notification to signalling staff in connection with the protection of traffic.
Автоматический перевод:
Создание отчетов застежек дорожки (иначе NR/SP/TRK/134)
Эта процедура касается всех застежек дорожки, как определено в параграфе. 3, ли, происходя в соединенной или сварной дорожке.
ЦЕЛЬ
Эта процедура дает требования для создания отчетов застежек дорожки. Это определяет
• заслуживающие публикации застежки дорожки;
• необходимые отчеты;



