0 продуктов

Авторизация

NR NR/L3/SIG/10665 ISSUE 14 Reliability Centred Maintenance Signalling Equipment (RoSE) - Compliance Date: 31 May 2017

Список продуктов
Данный раздел/документ содержится в продуктах:

 

Network Rail

Reliability Centred Maintenance Signalling Equipment (RoSE) - Compliance Date: 31 May 2017
 N NR/L3/SIG/10665 ISSUE 14

 

Annotation

 

This document covers the conditions required to allow the transition from the default maintenance regime to a Reliability-Centred Maintenance regime for signalling equipment.

This document applies to:

a) Section Managers (Signals);

b) Signal & Telecoms Maintenance Engineers;

c) Route Asset Managers (Signals).

Purpose

This document contains the prerequisites, allowing Reliability-Centred Maintenance to be implemented on signalling equipment as an alternative to the default maintenance regime.

 

Автоматический перевод:

 

Надежность центрируемое оборудование сигнализации обслуживания (RoSE) - Дата соблюдения: 31 мая 2017

Этот документ касается условий, требуемых позволить переход от режима обслуживания по умолчанию до Центрируемого на надежности режима Обслуживания для оборудования сигнализации.

Этот документ относится:

a) Начальники участка (сигналы);

Категории продуктов

 

 

 

Знакомьтесь, "Техэксперт"

 Техэксперт для iPad

 Для Android

АКЦИЯ!

Бесплатный доступ