NR NR/L1/HSS/00126 ISSUE 1 Prevention through Engineering and Design (PtED) Policy - Compliance Date: 4 December 2017
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 147 ISSUE 1 'Earthing & Bonding’ of Signalling Equipment Summary
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- Картотека зарубежных и международных стандартов
Network Rail
Prevention through Engineering and Design (PtED) Policy - Compliance Date: 4 December 2017
N NR/L1/HSS/00126 ISSUE 1
Annotation
This policy sets requirements for the implementation, monitoring and review of prevention through engineering and design (PtED) within Network Rail.
This policy applies to the whole of Network Rail including but not limited to, all functions, routes, major programmes, projects, regions, alliances and joint ventures.
There are no direct requirements on the Network Rail supply chain in this standard.
Purpose
This policy commits Network Rail to establish and continually improve the means of engineering or designing, the elimination or reduction of hazards and risks in areas of:
a) safety;
b) health and wellbeing;
c) sustainability
d) environmental protection
e) security; and
f) inclusion.
This policy also supports Network Rail’s compliance with primary legislation and regulations made under it, in particular the:
a) Health and Safety at Work Act 1974 (as revised);
i. Construction (Design and Management) Regulations 2015;
ii. Railways and Other Guided Transport Systems (Safety) Regulations 2006 (as amended); and
iii. Management of Health and Safety at Work Regulations 1999.