0 продуктов

Авторизация

NR NR/L1/SIG/50021/02 ISSUE 2 Signalling Asset Policy: Technology - Compliance Date: 1 April 2019

Список продуктов
Данный раздел/документ содержится в продуктах:

 

Network Rail

Signalling Asset Policy: Technology - Compliance Date: 1 April 2019
 N NR/L1/SIG/50021/02 ISSUE 2

 

Annotation

 

This module is the Control, Command & Signalling (CCS) technology strategy and supports the signalling asset policy.

It is part of a suite of modules detailing information and guidance on policy; this is the technology module and should be read in conjunction with other associated policy modules.

This module covers conventional signalling assets only and does not include level crossing or Digital Railway strategy.

This technology strategy applies to Route Asset Managers (Signalling) for implementing on signalling projects on Network Rail Managed Infrastructure.

Purpose

The purpose of this module is to specify the Signalling Technology strategy for Control, Command and Signalling (CCS) systems for CP6 and beyond.

 

Автоматический перевод:

 

Сигнализация о политике актива: технология - дата соответствия: 1 апреля 2019

Этот модуль является Контролем, Командой и Сигнальный (CCS) технологическая стратегия и поддерживает сигнальную политику актива.

Это - часть комплекта модулей, детализирующих информацию и руководство на политике; это - технологический модуль и должно быть прочитано в сочетании с другими связанными стратегическими модулями.

Категории продуктов

 

 

 

Знакомьтесь, "Техэксперт"

 Техэксперт для iPad

 Для Android

АКЦИЯ!

Бесплатный доступ