NR NR/L3/TRK/3104 ISSUE 2 Asset Data Extraction and Topographic Surveying – Signalling - Compliance Date: 4 March 2017
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 147 ISSUE 1 'Earthing & Bonding’ of Signalling Equipment Summary
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- Картотека зарубежных и международных стандартов
Network Rail
Asset Data Extraction and Topographic Surveying – Signalling - Compliance Date: 4 March 2017
N NR/L3/TRK/3104 ISSUE 2
Annotation
This Network Rail standard specifies the provision of Signalling asset data for use when changes to the location or arrangement of the trackside signalling assets or renewals of the Signalling system are to be undertaken.
It covers the development, design, construction, testing and commissioning of Signalling assets on the Network Rail infrastructure. Also access to the data is via existing data repositories where the validity of the data is known. Where the validity is uncertain, the survey methodologies specified in this standard apply.
This document includes the collection of data from existing, non video, sources and applies only to topographic surveys associated with the introduction or relocation of trackside signalling assets, since correlation of wiring, etc. and other surveys are covered by other processes and standards.
The scope may include the creation of new data from several sources That may include a topographic survey but not in every case.
It does not include the capture of data from on train video surveys, although the accuracies of these are rapidly improving and are the most efficient.
GRD016, Signalling Asset Survey Data Specification defines the format of the data to be delivered by the survey for use within Signalling project development and design, e.g. production of scheme plans.
The ongoing configuration management of the “as-is” Signalling asset data is outside of the scope of this standard.
This standard supports the general Level 2 survey standard NR/L2/TRK/3100, Topographic, Engineering, Land and Measured building surveying – Strategy and general (as given in Figure 1), particularly in the need to set out a Project Survey Strategy.