NR NR/L2/CIV/086 ISSUE 5 Management of Earthworks - Compliance Date: 3 February 2017
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/L2/OHS/00113 ISSUE 5 Health Surveillance and Management of Diagnoses for Hand-Arm Vibration Syndrome - Compliance Date: 4 June 2016
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 000 ISSUE 37 Current Index of Notice Boards Contained in NR/L2/SIG/11120
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NB 145 ISSUE 1 Non-Conceptual Design and Test (Functionally Equivalent Design)
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 142 ISSUE 1 Requirements for Whistle Boards
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NB 147 ISSUE 1 'Earthing & Bonding’ of Signalling Equipment Summary
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/CHANGES ISSUE 103 Changes from Last Issue
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/IHS/WITHDRAWN ISSUE 103 Documents Withdrawn or Superseded in the last Twelve Months
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NR/GN/ELP/27318 ISSUE 1 Insulation Monitoring of 650 V Earth - Free ( IT System) Power Cables - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
- NR NRS-SRB001 ISSUE 102 V2 Standards Briefing Report for December 2016 - Version 2 - Contains Powerpoint and Excel attachments
- NR NR/IHS/WITHDRAWN ISSUE 102 Documents Withdrawn or Superseded in the last Twelve Months
- Картотека зарубежных и международных стандартов
Network Rail
Management of Earthworks - Compliance Date: 3 February 2017
N NR/L2/CIV/086 ISSUE 5
Annotation
This business process covers all Earthworks within the Network Rail boundary, and where it is appropriate to do so, slopes outside the boundary that might affect Network Rail infrastructure.
It applies to:
1. Network Rail owned or managed2 Earthworks equal to or greater than 3 metres high - this includes Earthworks lying above a Retaining Wall where the Earthwork component is greater than or equal to 3 metres;
2. Network Rail owned or managed1 Earthworks (irrespective of their height) whose failure could pose an unacceptable risk to the safe operation or performance of railway infrastructure, for example, those Earthworks which have a history of instability, or are at risk of flooding or water action;
3. Outside Party Slopes (irrespective of their height) whose failure could pose an unacceptable risk to the safe operation or performance of railway infrastructure (section 7.4 only applies). If application of this Standard is not appropriate to such slopes then a suitable bespoke system should be adopted to manage the risk;
4. Earthworks (irrespective of their height) that lie above the portal of a railway tunnel;
5. Approach Embankments to an overline Bridge that are equal to or greater than 3 metres high, except those owned by a Highway Authority, Roads Authority or other competent authority;
6. Nailed or reinforced soil structures whose face angle is less than or equal to 70 degrees to the horizontal;
7. Any Embankment that also acts as a Coastal, Estuarine or River Defence, irrespective of its height.



