0 продуктов

Авторизация

NR NR/L2/OPS/110 ISSUE 3 Requirements for the Weekly Operating Notice, Periodical Operating Notice and Local Operating Instructions (incl. Sectional Appendix) - Compliance Date: 4 March 2017

Список продуктов
Данный раздел/документ содержится в продуктах:

 

Network Rail

Requirements for the Weekly Operating Notice, Periodical Operating Notice and Local Operating Instructions (incl. Sectional Appendix) - Compliance Date: 4 March 2017
 N NR/L2/OPS/110 ISSUE 3

 

Annotation

 

Applicable to Network Rail functions and contractors who plan engineering work and submit items for publication in the Weekly Operating Notice (WON), and to those who compile the WON.

Applicable to Network Rail functions who compile the Periodical Operating Notice (PON), and those who submit items for publication in, or who compile, Local Operating Instructions.

Purpose

This document mandates requirements for the production of information related to engineering work, alterations to track and signalling arrangements, and Local Operating Instructions.

 

Автоматический перевод:

 

Требования для еженедельного операционного уведомления, периодического операционного уведомления и местных инструкций по эксплуатации (включая частное приложение) - дата соответствия: 4 марта 2017

Применимый к функциям Network Rail и подрядчикам, планирующим инженерные работы и представляющим позиции для публикации в Еженедельно управлении уведомлением (WON), и тем, кто собирает WON.

Применимый к Network Rail функционирует, кто собирает Периодическое операционное уведомление (PON), и те, кто представляет позиции для публикации в, или кто собирает, Местные Инструкции по эксплуатации.

Категории продуктов

 

 

 

Знакомьтесь, "Техэксперт"

 Техэксперт для iPad

 Для Android

АКЦИЯ!

Бесплатный доступ