NR NR/L2/TRK/2102/BRIEFING ISSUE 1 Briefing Materials for NR/L2/TRK/2102 Issue 8: Design and Construction of Track - Summary and Details of Changes and Further Explanation Behind Changes

Список продуктов
Данный раздел/документ содержится в продуктах:

 

Network Rail

Briefing Materials for /L2/TRK/2102 Issue 8: Design and Construction of Track - Summary and Details of Changes and Further Explanation Behind Changes
 N NR/L2/TRK/2102/BRIEFING ISSUE 1

 

Annotation

 

The scope of the document has been amended to restrict it to track with line speeds up to and including 140mph (previously Issue 6 had no upper speed limit). The restriction to 140mph is in line with Railway Group Standards and specifically ‘5021 – Track System Requirements.

Purpose

This document explains the principal changes made to NR/L2/TRK/2102 issue 6 in the drafting of issue 8 and where possible, provision of additional information as to why the changes have been made. The document explains the changes between issue 6 and issue 8 as issue 7 was not thoroughly briefed or varied into contracts with many users still working to issue 6.

 

Автоматический перевод:

 

Брифинг Материалов для Проблемы NR/L2/TRK/2102 8: Проектирование и строительство Пути - Резюме и Подробные данные Изменений и Дальнейшего Объяснения Позади Изменений

Объем документа был исправлен для ограничения его путем со скоростями линии до и включая 140 миль в час (ранее, Проблема 6 не имела никакого верхнего ограничения скорости). Ограничение на 140 миль в час соответствует Стандартам Railway Group и в частности ‘5021 – Требования Системы транспортировки.

Категории продуктов

 

 

 

Знакомьтесь, "Техэксперт"

 Техэксперт для iPad

 Для Android

АКЦИЯ!

Бесплатный доступ