CEI CLC/TS 50549-1 Requirements for the connection of a generating plant to a distribution system Part 1: Connection to a LV distribution system and above 16 A
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 61010-1 Safety requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements - Edition 3.0; Incorporates Corrigendum 1: 05/2011 and Corrigendum 2: 10/2013 (Applies to French Text Only); Includes Interpretation 1: 02/2013
- 13
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 61010-1 Safety requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements - Edition 3.0; Incorporates Corrigendum 1: 05/2011 and Corrigendum 2: 10/2013 (Applies to French Text Only); Includes Interpretation 1: 02/2013
- 13.160
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 61010-1 Safety requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements - Edition 3.0; Incorporates Corrigendum 1: 05/2011 and Corrigendum 2: 10/2013 (Applies to French Text Only); Includes Interpretation 1: 02/2013
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- 35
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 61010-1 Safety requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements - Edition 3.0; Incorporates Corrigendum 1: 05/2011 and Corrigendum 2: 10/2013 (Applies to French Text Only); Includes Interpretation 1: 02/2013
- 35.100
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 61010-1 Safety requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements - Edition 3.0; Incorporates Corrigendum 1: 05/2011 and Corrigendum 2: 10/2013 (Applies to French Text Only); Includes Interpretation 1: 02/2013
- 35.100.05
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 61010-1 Safety requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements - Edition 3.0; Incorporates Corrigendum 1: 05/2011 and Corrigendum 2: 10/2013 (Applies to French Text Only); Includes Interpretation 1: 02/2013
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- IEC 62041 Safety of transformers, reactors, power supply units and combinations thereof – EMC requirements - Edition 2.0
- CENELEC CLC/TR 62685 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3 functional safety communication profiles (FSCPs)
- Картотека зарубежных и международных стандартов
Comitato Elettrotecnico Italiano
Requirements for the connection of a generating plant to a distribution system Part 1: Connection to a LV distribution system and above 16 A
N CLC/TS 50549-1
Annotation
The purpose of this Technical Specification is to provide technical guidance on the requirements for generating plants which can be operated in parallel with a distribution network. For practical reasons, this Technical Specification refers to the distribution system operator in case settings have to be defined and/or provided, even when these settings are to be defined and/or provided by another actor according to national and European legal framework.
NOTE 1 This includes European network codes and their national implementation, as well as further national regulations.
NOTE 2 Further national requirements especially for the connection to the distribution network and the operation of the generating plant can apply.
The requirements of this Technical Specification apply to all generating plants, electrical machinery and electronic equipment, irrespective of the kind of primary energy source and irrespective of the presence of loads in the producer’s network that meet all of the following conditions:
– converting any primary energy source into AC electricity;
– connected to a LV distribution network and rated at more than 16 A per phase;
– intended to operate in parallel with this distribution network under normal network operating conditions.
NOTE 3 Generating plants rated up to and including 16 A per phase are covered by EN 50438.
NOTE 4 Generating plants connected to a MV distribution network fall into the scope of CLC/TS 50549-2.



