API SPEC 7F Oil Field Chain and Sprockets - EIGHTH EDITION; ERTA: May 2013
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- ASME NUM-1 Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
- ASME HST-4 Performance Standard for Overhead Electric Wire Rope Hoists
- ASME B30.14 Side Boom Tractors
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 INTERPRETATIONS Interpretations to B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment - Includes Interpretations Through June 2010
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.22 Articulating Boom Cranes
- ASME B30.22 Articulating Boom Cranes
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME P30-1 Planning for Load Handling Activities
- ASME P30-1 Planning for Load Handling Activities
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.28 Balance Lifting Units
- ASME B30.28 Balance Lifting Units
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME B30.10 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME NOG-1 Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) - Includes Interpretations through January 2010
- ASME STP-NU-015 A Guide to American Crane Standards for Electric Overhead Traveling Cranes, Hoists and Related Equipment for Nuclear Facilities
- ASME HST-6 Performance Standard for Air Wire Rope Hoists
- ASME B30.16 Overhead Hoists (Underhung)
- ASME HST-1 Performance Standard for Electric Chain Hoists
- ASME B29.1 Precision Power Transmission Roller Chains, Attachments, and Sprockets - Partition From ASME B29.100
- Картотека зарубежных и международных стандартов
American Petroleum Institute
Oil Field Chain and Sprockets - EIGHTH EDITION; ERTA: May 2013
N SPEC 7F
Annotation
This specification covers the manufacture of the components for, and the assembly and packaging of, single and multiple strand, number 40 through 240, standard and heavy series roller chains for oil field applications, including chain designation, chain length tolerance, tensile strength specifications, pin and bushing press-out specifications, and dynamic test requirements.
For informational purposes, Annex A provides recommendations for installation, lubrication, and maintenance of oil field chain drives and Annex B includes a basic description of roller chain sprockets.
Автоматический перевод:
Цепь нефтяного месторождения и звездочки - EIGHTH EDITION; ERTA: май 2013
Эта спецификация покрывает изготовление компонентов для, и блок и упаковка, единственная и многократная скрутка, номер 40 - 240, стандартные и тяжелые серийные цепочки ролика для приложений нефтяного месторождения, включая цепочечное обозначение, цепочечный допуск длины, спецификации предела прочности, контакт и втулку спецификаций нажатия и требований динамического испытания.
В информационных целях приложение A предоставляет рекомендации для установки, смазки, и обслуживание дисков цепочки нефтяного месторождения и Приложения B включает основное описание звездочек цепочки ролика.



