ASTM F1804 Standard Practice for Determining Allowable Tensile Load for Polyethylene (PE) Gas Pipe During Pull-In Installation
Данный раздел/документ содержится в продуктах:
- Техэксперт: Машиностроительный комплекс
- Картотека зарубежных и международных стандартов
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM F2390 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent (DWV) Pipe and Fittings Having Post-Industrial Recycle Content
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- 13
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM F2390 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent (DWV) Pipe and Fittings Having Post-Industrial Recycle Content
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- 13.220
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM F2390 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent (DWV) Pipe and Fittings Having Post-Industrial Recycle Content
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- 13.220.40
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM F2390 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent (DWV) Pipe and Fittings Having Post-Industrial Recycle Content
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- 19
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM F2390 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent (DWV) Pipe and Fittings Having Post-Industrial Recycle Content
- ASTM D618 Standard Practice for Conditioning Plastics for Testing
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- ASTM F2390 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent (DWV) Pipe and Fittings Having Post-Industrial Recycle Content
- ASTM F480 Standard Specification for Thermoplastic Well Casing Pipe and Couplings Made in Standard Dimension Ratios (SDR), SCH 40 and SCH 80
- ASTM D2122 Standard Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings
- ASTM F894 Standard Specification for Polyethylene (PE) Large Diameter Profile Wall Sewer and Drain Pipe
- ASTM F585 Standard Guide for Insertion of Flexible Polyethylene Pipe Into Existing Sewers
- ASTM G125 Standard Test Method for Measuring Liquid and Solid Material Fire Limits in Gaseous Oxidants
- Картотека зарубежных и международных стандартов
ASTM International
Standard Practice for Determining Allowable Tensile Load for Polyethylene (PE) Gas Pipe During Pull-In Installation
N F1804
Annotation
This practice provides a means to determine an allowable tensile load (ATL) value for a polyethylene gas pipe that is to be installed underground using methods that pull the pipe into a trench (cut or plowed), bore hole, casing pipe, or the like. The ATL value takes into account pipe size, tensile yeild strength, pipe temperature, and pulling load duration.
The ATL is used to set the break-away strength for a “weak-link” device, or as a limit setting for other devices that control the maximum pulling force exerted by equipment used to pull polyethylene gas pipe into an underground location, or to determine if pulling equipment can extert pulling force greater than the ATL value for the gas pipe being installed. A weak-link device is installed where the pipe pulling equipment is connected to the polyethylene gas pipe. If pulling load exceeds the ATL limit, the device de-couples the pipe from the pulling equipment. Other measures or equipment that limit the pulling force on the pipe are also used. When the ATL value is compared to the pulling force developed by the pull-in installation equipment and equipment cannot extert pulling force greater than the ATL value, a weak-link or other device for limiting the pulling force is not necessary.
This practice does not address weak-link device design or requirements, nor does it address the design or requirements for other equipment or procedures used to limit the pulling force applied to polyethylene gas pipe during pull-in installation.
This practice does not address installation methods or procedures employed for pull-in of polyethylene gas pipe.
The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.